CVL cleanup: Difference between revisions

From the Linux and Unix Users Group at Virginia Teck Wiki
Jump to navigation Jump to search
imported>Mjh
Created page with "The CVL is quite messy now due to recent hardware acquisitions. VTLUUG should do the following: * Replace Sunway patch cables with our own * Mount/put on rails all rackmount s..."
 
No edit summary
 
(4 intermediate revisions by 4 users not shown)
Line 2: Line 2:
* Replace Sunway patch cables with our own
* Replace Sunway patch cables with our own
* Mount/put on rails all rackmount servers
* Mount/put on rails all rackmount servers
* Cleanup the 3 towers we use
* Cleanup the 3 unrackable towers we use
** Put underneath the ghetto cluster?
** Put underneath the ghetto cluster?
* Find somewhere to put the giant SGI monitor (won't fit in a rack)
* Find somewhere to put the giant SGI monitor (won't fit in a rack)
Line 13: Line 13:
* Inventory spare components, document on wiki
* Inventory spare components, document on wiki
* Make 10-12U of space at the bottom of rack 1 if possible (PE2900s coming soon)
* Make 10-12U of space at the bottom of rack 1 if possible (PE2900s coming soon)
* Label all machines
** Should have hostname, IP, contact (or mail alias), and services running on it
** Also should have owner if applicable


We should buy:
See [[funding]] for a list of things we are seeking for cable management, etc
* Zipties - tons and various sizes
* Velcro cable ties
* Patch cables
* Labelmaker tape
* Rack hardware
* Dell rails (that can fit non-dell servers)
* Power strips, extension cords, etc
* Ethernet connectors


[[Category:VTLUUG Projects]]
[[Category:VTLUUG:Projects]]
[[Category:Howtos]]
[[Category:Deprecated]]

Latest revision as of 08:41, 3 January 2019

The CVL is quite messy now due to recent hardware acquisitions. VTLUUG should do the following:

  • Replace Sunway patch cables with our own
  • Mount/put on rails all rackmount servers
  • Cleanup the 3 unrackable towers we use
    • Put underneath the ghetto cluster?
  • Find somewhere to put the giant SGI monitor (won't fit in a rack)
  • Get a more stable way to hold a monitor in rack 1
  • Cable management (rack 1 especially)
  • Clean out unused servers from rack 1
    • Telnoratti has been doing this and recording their specs
    • Figure out who owns these, can possibly cannibalize
  • Move KVM switch to middle of the rack (cables aren't long enough)
  • Inventory spare components, document on wiki
  • Make 10-12U of space at the bottom of rack 1 if possible (PE2900s coming soon)
  • Label all machines
    • Should have hostname, IP, contact (or mail alias), and services running on it
    • Also should have owner if applicable

See funding for a list of things we are seeking for cable management, etc